Mezzanine Floors offer an opportunity to increased floor space in areas that have wasted head
room enabling them ability to expand their business in a cost effective way.
The normal project timetable is as follows:
Week 1 - Detailed site survey
Week 2 - Design and production of general arrangement (GA) drawing
Week 3 - Client approval of design and GA
Week 4 - Structural steel manufacture
Week 5 - Mezzanine installation
|